Fujitsu SPARC ENTERPRISE M8000 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Komputery Fujitsu SPARC ENTERPRISE M8000. FUJITSU SPARC ENTERPRISE M8000 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
Przeglądanie stron 0
1 2 3 4 5 6 ... 513 514

Podsumowanie treści

Strona 2

viii SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.2.1 Disconnecting a FRU from a Domain 4–34.2.1.1 Disconnecting a CMU/IOU 4–34.

Strona 3 - Service Manual

4-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009When the tests are complete the program will return to the original menu. Selectc

Strona 4

Chapter 4 FRU Removal Preparation 4-71. Configuring into a domainTo configure CMU or IOU into the domain, enter the following command fromthe terminal

Strona 5

4-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Note – The display may vary depending on the XCP version.For details of the showh

Strona 6

Chapter 4 FRU Removal Preparation 4-9XSCF> showhardconfSPARC Enterprise M9000; + Serial:PA30601004; Operator_Panel_Switch:Locked;+ Power_Supply_

Strona 7 - Contents

4-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Output for the showhardconf command (Continued) + Core:4; Strand:2;

Strona 8

Chapter 4 FRU Removal Preparation 4-11Output for the showhardconf command (Continued)2. Verify the status LEDs on the PCI cassette.The POWER LED shoul

Strona 9 - Contents vii

4-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.3 Hot ReplacementIn hot replacement the Solaris OS does not need to be configu

Strona 10

Chapter 4 FRU Removal Preparation 4-13The command is menu-driven. The example continues using a FAN unit.The replacefru command will automatically tes

Strona 11 - Contents ix

4-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009When the tests are complete the program will return to the original menu. Select

Strona 12

Chapter 4 FRU Removal Preparation 4-154.3.2 Confirming the Hardware1. Use the showhardconf command to confirm the new component has beeninstalled:XSCF

Strona 13 - Contents xi

Contents ix4.5.3.3 SPARC Enterprise M8000 Server Three-Phase PowerFeed 4–314.5.3.4 SPARC Enterprise M9000 Server Single-Phase PowerFeed 4–324.5.3.5 SP

Strona 14

4-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Output for the showhardconf command (Continued) + Memory_Size:32 GB;

Strona 15 - Contents xiii

Chapter 4 FRU Removal Preparation 4-17Output for the showhardconf command (Continued)Refer to the showhardconf man page for more information.2. Verify

Strona 16

4-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.4 Cold ReplacementIn cold replacement all business operations are stopped. Col

Strona 17 - Contents xv

Chapter 4 FRU Removal Preparation 4-192. Back up the system files and data as necessary.3. Log into the XSCF Shell and type the poweroff commandThe fo

Strona 18

4-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.4.2.2 From the Maintenance TerminalFollow the power-on procedure below using t

Strona 19 - Glossary

Chapter 4 FRU Removal Preparation 4-21XSCF> showhardconfSPARC Enterprise M9000; + Serial:PA30601004; Operator_Panel_Switch:Locked; + Power_Su

Strona 20

4-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Output for the showhardconf command (Continued) + Core:2; Strand:2;

Strona 21 - Preface xix

Chapter 4 FRU Removal Preparation 4-23Output for the showhardconf command (Continued) MEM#00B Status:Normal; + Code:7f7ffe0000000000

Strona 22

4-24 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Output for the showhardconf command (Continued)Refer to the showhardconf man pag

Strona 23 - Servers Documentation

Chapter 4 FRU Removal Preparation 4-25Note – When you choose three-phase power feed option, the dual power feedoption is always included.4.5.1.1 AC In

Strona 24 - Book Titles Manual Codes

x SPARC Enterprise M8000/M9000 Servers Service Manual • August 20096.2.2.2 Adding a SPARC64 VII CPU Module to a DomainConfigured With SPARC64 VI 6–106

Strona 25 - Preface xxiii

4-26 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 4-2 Internal Connection of Power Supply (Three-Phase Power Feed)To use th

Strona 26 - Product Handling

Chapter 4 FRU Removal Preparation 4-274.5.1.2 Power SystemThere are two types of power system: single power and dual power.FIGURE 4-3 shows the concep

Strona 27 - Preface xxv

4-28 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.5.2.1 Power-On1. Turn on all the main line switches of the expansion cabinet.I

Strona 28 - Limitations and Cautions

Chapter 4 FRU Removal Preparation 4-294.5.3.1 SPARC Enterprise M8000 Server Single-Phase Power FeedFIGURE 4-4 Main Line Switch Locations (Rear of the

Strona 29 - Preface xxvii

4-30 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.5.3.2 SPARC Enterprise M8000 Server Single-Phase and DualPower FeedFIGURE 4-5

Strona 30

Chapter 4 FRU Removal Preparation 4-314.5.3.3 SPARC Enterprise M8000 Server Three-Phase Power FeedFIGURE 4-6 Main Line Switch Locations (Power Cabinet

Strona 31 - Troubleshooting

4-32 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.5.3.4 SPARC Enterprise M9000 Server Single-Phase Power FeedFIGURE 4-7 Main Lin

Strona 32

Chapter 4 FRU Removal Preparation 4-334.5.3.5 SPARC Enterprise M9000 Server Single-Phase and DualPower FeedFIGURE 4-8 Main Line Switch Locations (Fron

Strona 33 - Safety and Tools

4-34 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.5.3.6 SPARC Enterprise M9000 Server Three-Phase Power FeedFIGURE 4-9 Main Line

Strona 34 - 1.1.2 Prompt Notations

Chapter 4 FRU Removal Preparation 4-354.6 Emergency Switch-OffIn emergency situations (such as smoke or flames are coming from the server), youneed to

Strona 35

Contents xi11. XSCF Unit Replacement 11–111.1 Overview of the XSCFU 11–111.2 Active Replacement and Hot Replacement 11–511.3 Cold Replacement 11–1112.

Strona 36 - 1.2 Precautions

4-36 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 4-10 Example of the External I/O Expansion Units Mounted in the Rack Spac

Strona 37 - Maintenance Tools

Chapter 4 FRU Removal Preparation 4-37Note – The SPARC Enterprise M8000 server comes with 22 short hook-and-loopfasteners and 4 long hook-and-loop fas

Strona 38

4-38 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.7.1.2 When Three External I/O Expansion Units MountedThis section provides an

Strona 39 - Product Overview and

Chapter 4 FRU Removal Preparation 4-392. Run the remaining cables along the left route.FIGURE 4-11 Cable Routing When Three External I/O Expansion Uni

Strona 40 - FIGURE 2-3, FIGURE 2-6

4-40 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20093. Bind the cables connected to each external I/O expansion unit with a shorthoo

Strona 41 - FIGURE 2-1 Front View - M8000

Chapter 4 FRU Removal Preparation 4-41FIGURE 4-12 Magnified View of Part A (M8000, rear view)

Strona 42 - Air Filter

4-42 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.7.1.3 For Server Using Three-phase Power FeedNote – The server using three-pha

Strona 43

Chapter 4 FRU Removal Preparation 4-4310. Divide the remaining cables into three routes (about 12 cables per route), bindthe cables on each route with

Strona 44

4-44 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200911. Fasten the cables running along the left route to the cable holder with a sh

Strona 45

Chapter 4 FRU Removal Preparation 4-45FIGURE 4-16 Completed Cable Routing with Three External I/O Expansion Units Mounted(M8000, rear view)

Strona 46

xii SPARC Enterprise M8000/M9000 Servers Service Manual • August 200917. Crossbar Unit Replacement 17–117.1 Overview of XBUs 17–117.2 Cold Replacement

Strona 47

4-46 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.7.1.4 When One External I/O Expansion Unit MountedThis section provides an exa

Strona 48

Chapter 4 FRU Removal Preparation 4-47FIGURE 4-17 Cable Routing When One External I/O Expansion Unit Mounted (M8000, rear view)VentilationslitsPart AP

Strona 49 - 2.2 Labels

4-48 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. Bind the cables from the external I/O expansion unit with a shorthook-and-loo

Strona 50 - EZ label (besides Japan)

Chapter 4 FRU Removal Preparation 4-49FIGURE 4-19 Magnified View of Part B (M8000, rear view)

Strona 51 - System Name Plate Label

4-50 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 4-20 Completed Cable Routing with One External I/O Expansion Unit Mounted

Strona 52 - M9000 Label Location

PA RTII MaintenancePart II explains how to remove and replace FRUs.The chapters are organized according to the FRU mounting locations.Chapter 6 starts

Strona 54 - 2.3 Operator Panel

5-1CHAPTER5Internal Components AccessThis chapter explains how to access each unit of the server, in the following sections: Section 5.1, “How to Ope

Strona 55

5-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. Push the projection down below the handle.The part below the handle projects o

Strona 56 - 2.3.3 LED

Chapter 5 Internal Components Access 5-35.3 How to Remove a DoorIf it is absolutely necessary to remove a door during maintenance, refer toFIGURE 5-2

Strona 57

Contents xiii24. Addition and Deletion of a RDPF Option, Power Cabinet, and M9000Expansion Cabinet 24–124.1 Addition and Deletion of Rack-mountable Du

Strona 58 - 2.3.4 Switch

5-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20095. Keep the door in a safe place.To reinstall the door, reverse the above steps f

Strona 59 - Methods To Use

Chapter 5 Internal Components Access 5-5The procedure for removing the side panel is follows.1. Using a Phillips screwdriver, completely loosen the on

Strona 60

5-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 61 - Configuration

6-1CHAPTER6Replacement of CPU/MemoryBoard Unit (CMU), CPU, and DIMMThis chapter explains the procedures for replacing the CPU/Memory board unit(CMU) a

Strona 62 - Configurations

6-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009For the version matching of firmware, see the SPARC EnterpriseM3000/M4000/M5000/M

Strona 63 - Command Description

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-3FIGURE 6-2 CMU Mounting Locations (Rear of the M9000 Base Cabinet)CMU#7CMU#6CMU

Strona 64 - XSCF> version

6-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-3 CMU Mounting Locations (Rear of M9000 with the Expansion Cabinet)TABLE

Strona 65 - ■ Diagnoses the problems

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-56.2 CPU UpgradeThis section describes the procedure to mount the SPARC64 VII pr

Strona 66 - 2.6.2 Monitoring Output

6-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094. Collect an XSCF snapshot to archive system status prior to upgrade.This will b

Strona 67 - 2.6.3 Messaging Output

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-713. Sets the following for the CMU. Set up XSB. Set up the domain Set up the

Strona 68 - 2.7 LED Error Display

xiv SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.4 I/O Unit B–8B.5 Hard Disk Drive B–10B.6 PCI Cassette B–10B.7 IOU Onboard Devi

Strona 69 - LED Display and meaning

6-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20096.2.2 SPARC64 VII Processors Added to an ExistingDomainAdding SPARC64 VII Process

Strona 70

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-98. Update the XCP version.For the firmware updating procedures, see the SPARC E

Strona 71 - MeaningType Display

6-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 If you are upgrading an existing SPARC64 VI CPU module in an existing domain t

Strona 72

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-118. Confirm that the target domain has been correctly started.9. Confirm no abn

Strona 73 - 2.8.3 Using the fmadm Command

6-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098. Confirm that the target domain has been correctly started.9. Confirm no abnor

Strona 74 - 2.8.3.3 fmadm repair Command

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-13c. Execute the showboards command to check the use states of the devices andre

Strona 75 - Commands

6-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20093. Prepare the CMU that is to be replaced. Active replacement:From the terminal

Strona 76 - 2.9.1 iostat Command

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-15Note – DDC_A is displayed only for the M8000.b. From the replacement parts lis

Strona 77 - 2.9.2 prtdiag Command

6-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-5 Removing the CMU (Front of the M8000)1123

Strona 78

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-17FIGURE 6-6 Removing the CMU (Rear of the M9000 Base Cabinet)7. Place the remov

Strona 79

Contents xvD. UPS Controller D–1D.1 Overview D–1D.2 Signal Cable D–1D.3 Configuration of Signal Lines D–2D.4 Power Supply Conditions D–4D.4.1 Input Ci

Strona 80

6-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200910. Replace parts.In CMU replacement:Remove all the CPUs and DIMMs mounted in th

Strona 81

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-19For DIMM replacement:Replace each swap target DIMM mounted in the removed CMU

Strona 82 - 2.9.3 prtconf Command

6-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200913. Mount the replacement CMU by following the removal instructions in Step 6 in

Strona 83 - 2.9.3.1 Options

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-2116. Confirm that the replacement components are normal by using theshowhardcon

Strona 84 - 2.9.4 netstat Command

6-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20095. Switch off all main line switches for the AC section (ACS) in the power suppl

Strona 85 - 2.9.5 ping Command

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-239. Remove the cover of the CMU.a. Pull the two latches on the connector side o

Strona 86 - 2.9.5.1 Options

6-24 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Note – Mount the dummy (filler) unit in the same manner as CMU. Since the samele

Strona 87 - 2.9.6 ps Command

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-25Note – The showstatus command displays information on degraded components.20.

Strona 88 - 2.9.7 prstat Command

6-26 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-8 CPU Module and DIMM (MEM) Mounting LocationsCPUM#3CPUM#2CPUM#1CPUM#0M

Strona 89 - Periodic Maintenance

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-276.5.1 Replacing a CPU ModuleTo replace the CPU module, use the CPU Module inse

Strona 90

xvi SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 91

6-28 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20091. Remove the CPU Module.a. Insert the tips on the extraction side of the CPU Mo

Strona 92 - Removal of Air Filters

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-29FIGURE 6-11 CMU Guide Lock (Enlarged)Caution – When using the CPU Module inser

Strona 93 - Fixing bracket (x3)

6-30 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-12 Lever Up the CPU ModuleCaution – When tilting the CPU Module inserti

Strona 94

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-31FIGURE 6-13 Remove the CPU Moduled. Remove the CPU Module insertion/extraction

Strona 95 - FRU Removal Preparation

6-32 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. Attach the replacement CPU Module.a. Slide and insert the guide pin on the DD

Strona 96 - 4.1.1 FRU Replacement

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-33FIGURE 6-15 CMU Guide Lock (Enlarged)

Strona 97 - 4.2 Active Replacement

6-34 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009b. Fit the guide pin on the heat sink side of the CPU Module into the groove oft

Strona 98

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-35FIGURE 6-17 Set CPU Module Insertion/Extraction Tool

Strona 99

6-36 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-18 CMU Guide Lock (Enlarged)Caution – When using the CPU Module inserti

Strona 100 - 4.2.3.1 Configuring CMU/IOU

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-37FIGURE 6-19 Mounting the CPU ModuleCaution – Each CPU Module has two CMU guide

Strona 101 - 4.2.4 Confirming the Hardware

xviiPrefaceThis manual a maintenance manual for the SPARC Enterprise™ M8000/M9000servers. The manual explains basic operations and detailed replacemen

Strona 102 - Manual, or the man page

6-38 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009The CMU has 16 DIMMs as standard. The number of DIMMs that can be mountedon the

Strona 103

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-39FIGURE 6-20 shows an example of how to read the DIMM information displayed int

Strona 104

6-40 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 6-21 Memory Mounting ConditionsMEM#32AMEM#32BMEM#33AMEM#33BMEM#30AMEM#30B

Strona 105

Chapter 6 Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6-416.5.3 DIMM Replacement1. Open outward the tabs of the connector in which the D

Strona 106 - 4.3 Hot Replacement

6-42 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. Perform the above operation in reverse order to mount the DIMM.Note – To moun

Strona 107

7-1CHAPTER7I/O Unit (IOU) ReplacementThis chapter explains the replacement procedures for the I/O unit (IOU). It coversthe following: Section 7.1, “O

Strona 108

7-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – Adjust the positioning of the routes appropriately so that the cables d

Strona 109 - 4.3.2 Confirming the Hardware

Chapter 7 I/O Unit (IOU) Replacement 7-3FIGURE 7-1, FIGURE 7-2, FIGURE 7-3, FIGURE 7-4, and FIGURE 7-5 indicate the mountinglocations of IOUs.FIGURE 7

Strona 110

7-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 7-2 IOU mounting Locations (Front of the M9000 Base Cabinet)IOU#0IOU#2IOU#

Strona 111

Chapter 7 I/O Unit (IOU) Replacement 7-5FIGURE 7-3 IOU Mounting Locations (Rear of the M9000 Base Cabinet)IOU#7IOU#5IOU#3IOU#1

Strona 113 - 4.4.2 Powering the Server On

xviii SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Structure and Contents of This ManualThis manual is organized as described belo

Strona 114 - 4.4.3 Confirming the Hardware

7-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 7-4 IOU Mounting Locations (Front of M9000 with the Expansion Cabinet)IOU#

Strona 115

Chapter 7 I/O Unit (IOU) Replacement 7-7FIGURE 7-5 IOU Mounting Locations (Rear of M9000 with the Expansion Cabinet)TABLE 7-1 lists the abbreviated na

Strona 116

7-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20097.2 Active Replacement and HotReplacementThe active replacement procedure and hot

Strona 117

Chapter 7 I/O Unit (IOU) Replacement 7-9SPARC Enterprise M4000/M5000/M8000/M9000 Servers Dynamic Reconfiguration(DR) User’s Guide . For details on how

Strona 118 - 4.5.1 Types of Power Supply

7-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009c. From here, perform the operation according to the guidance displayed in thema

Strona 119 - 4.5.1.1 AC Input Power

Chapter 7 I/O Unit (IOU) Replacement 7-11FIGURE 7-7 Removing the IOU (Rear of M8000)1123

Strona 120

7-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 7-8 Removing the IOU (Front of M9000)1123

Strona 121 - 4.5.1.2 Power System

Chapter 7 I/O Unit (IOU) Replacement 7-13FIGURE 7-9 Removing the IOU (Rear of M9000)7. Place the removed IOU on an antistatic conductive mat.8. Dismou

Strona 122 - 4.5.2.2 Power-Off

7-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 7-10 Locations of PCI Slots and HDDs9. Mount the replacement IOU by follo

Strona 123 - -Main line switch (x3)

Chapter 7 I/O Unit (IOU) Replacement 7-15Note – In hot addition of an IOU, mount the CMU and IOU in the proper location.Otherwise, the added IOU may n

Strona 124 - Power Feed

Preface xix Chapter 9 Power Supply Unit (PSU) Replacement:Explains the replacement procedures for a power supply unit (PSU). Chapter 10 Operator Pan

Strona 125

7-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200912. Confirm that the replacement components are normal by using theshowhardconf

Strona 126 - -Main line switch (x5)

Chapter 7 I/O Unit (IOU) Replacement 7-175. Switch off all main line switches for the AC section (ACS) in the power supplysystem.For details, see Sect

Strona 127

7-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20099. Dismount the HDD (or filler panel) and the PCI cards on the detached IOU,and

Strona 128

Chapter 7 I/O Unit (IOU) Replacement 7-19 From the console that is connected to XSCF, execute thepoweron -d <domain-id> command of XSCF for the

Strona 129 - M8000 Server

7-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 130

8-1CHAPTER8FAN Unit ReplacementThis chapter explains the replacement procedures for the FAN unit (FANU). Itcovers the following: Section 8.1, “Overvi

Strona 131

8-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098.1 Overview of the FAN UnitThis section provides an overview of FAN unit and des

Strona 132 - Hook-and-loop Fasteners Used

Chapter 8 FAN Unit Replacement 8-3FIGURE 8-2 FAN Mounting Locations (Rear of the M8000)FAN_B#2-#7#7 #5#6 #4#3#2

Strona 133

8-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 8-3 FAN Mounting Locations (Front of the M9000 Base Cabinet)FAN_A#0-#3#1 #

Strona 134 - FIGURE 4-12.)

Chapter 8 FAN Unit Replacement 8-5FIGURE 8-4 FAN Mounting Locations (Rear of the M9000 Base Cabinet)FAN_A#4-#15#15 #12#14 #11#9 #6#8 #5#13 #10 #7 #4

Strona 135

xx SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 Chapter 24 Addition and Deletion of a Rack-mountable Dual Power Feed Option,Powe

Strona 136

8-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 8-5 FAN Mounting Locations (Front of M9000 with the Expansion Cabinet)Expa

Strona 137 - FIGURE 4-14.)

Chapter 8 FAN Unit Replacement 8-7FIGURE 8-6 FAN Mounting Locations (Rear of M9000 with the Expansion Cabinet)TABLE 8-1 lists the abbreviated names an

Strona 138 - FIGURE 4-15.)

8-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098.2 Active Replacement and HotReplacementCaution – Each cabinet contains multiple

Strona 139 - (M8000, rear view)

Chapter 8 FAN Unit Replacement 8-9c. From here, perform the operation according to the instructions displayed inthe maintenance menu.Check the states

Strona 140

8-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 8-9 Removing the FAN Unit (Rear of M8000)12

Strona 141 - Ventilation

Chapter 8 FAN Unit Replacement 8-11FIGURE 8-10 Removing the FAN Unit (Front of M9000)21

Strona 142 - FIGURE 4-19.)

8-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 8-11 Removing the FAN Unit (Rear of M9000)6. Place the removed FAN unit o

Strona 143

Chapter 8 FAN Unit Replacement 8-138. Go back to the terminal that is connected to XSCF, and perform the inputoperation according to the instructions

Strona 144

8-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 From a console that is connected to XSCF, log in to XSCF, and execute thepower

Strona 145 - II Maintenance

Chapter 8 FAN Unit Replacement 8-1512. Confirm that the XSCF STANDBY LED (green) on the operator panel remainslit. If it is blinking, wait until it re

Strona 146

Preface xxiSPARC Enterprise M8000/M9000Servers DocumentationThe manuals listed below are provided for reference.Book Titles Manual CodesSPARC Enterpri

Strona 147 - Internal Components Access

8-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 148 - That Can Be Accessed

9-1CHAPTER9Power Supply Unit (PSU)ReplacementThis chapter explains the replacement procedures for the power supply unit (PSU).It covers the following:

Strona 149 - 5.3 How to Remove a Door

9-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009For details of the types and locations of power supply, see Section 4.5,“Power-On

Strona 150 - Sensor unit

Chapter 9 Power Supply Unit (PSU) Replacement 9-3FIGURE 9-2 PSU Mounting Locations (Rear of M8000 + Power Cabinet)Power cabinet

Strona 151 - How to Remove a Side Panel

9-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 9-3 PSU Mounting Locations (Front of the M9000 Base Cabinet + Power Cabine

Strona 152

Chapter 9 Power Supply Unit (PSU) Replacement 9-5FIGURE 9-4 PSU Mounting Locations (Rear of the M9000 Base Cabinet + Power Cabinet)Power cabinet

Strona 153 - Replacement of CPU/Memory

9-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 9-5 PSU Mounting Locations (Front of M9000 with an Expansion Cabinet + Pow

Strona 154

Chapter 9 Power Supply Unit (PSU) Replacement 9-7FIGURE 9-6 PSU Mounting Locations (Rear of M9000 with an Expansion Cabinet + Power Cabinet)TABLE 9-1

Strona 155

9-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20099.2 Active Replacement and HotReplacementCaution – Each cabinet contains multiple

Strona 156 - M9000 base cabinet CMU#0 to 7

Chapter 9 Power Supply Unit (PSU) Replacement 9-9c. From here, perform the operation according to the instructions displayed inthe maintenance menu.Ch

Strona 157 - 6.2 CPU Upgrade

xxii SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009External I/O Expansion Unit Product Notes C120-E456SPARC Enterprise M3000/M4000/

Strona 158

9-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 9-9 Removing the PSU (Front of the M9000 Base Cabinet)6. Place the remove

Strona 159 - XSCF> showstatus

Chapter 9 Power Supply Unit (PSU) Replacement 9-11a. Perform operation according to instructions of messages. When the displayof the maintenance menu

Strona 160

9-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 From a console that is connected to XSCF, log in to XSCF, and execute thepower

Strona 161

Chapter 9 Power Supply Unit (PSU) Replacement 9-1312. Confirm that the XSCF STANDBY LED (green) on the operator panel remainslit. If it is blinking, w

Strona 162 - With SPARC64 VI

9-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 163 - Existing Domain

10-1CHAPTER10Operator Panel ReplacementThis chapter explains the replacement procedures for the operator panel (OPNL). Itcovers the following: Sectio

Strona 164 - Replacement

10-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 10-1 OPNL Mounting Location (Front of the M8000)OPNL

Strona 165

Chapter 10 Operator Panel Replacement 10-3FIGURE 10-2 OPNL Mounting Location (Front of the M9000 Base Cabinet)OPNL

Strona 166 - ■ Hot replacement:

10-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 10-3 OPNL Mounting Location (Front of M9000 with the Expansion Cabinet)TA

Strona 167

Chapter 10 Operator Panel Replacement 10-5Note – When the maintenance work is completed, be sure to confirm the modeswitch setting and return the swit

Strona 168

Preface xxiii1. Manuals on the WebThe latest versions of all the SPARC Enterprise Series manuals are available at thefollowing websites.Global Sitehtt

Strona 169 - FIGURE 6-7)

10-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 10-4 Removing the OPNL10. Place the removed OPNL on an antistatic conduct

Strona 170

Chapter 10 Operator Panel Replacement 10-7 Press and hold down (for less than four seconds) the POWER switch on theoperator panel. From a console th

Strona 171 - Duct cover

10-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 172

11-1CHAPTER11XSCF Unit ReplacementThis chapter explains the replacement procedures for an eXtended System ControlFacility unit (XSCFU). It covers the

Strona 173 - 6.4 Cold Replacement

11-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 11-1 XSCFU Mounting Locations (Front of the M8000)XSCFU_B#0XSCFU_B#1

Strona 174 - FIGURE 6-5 or FIGURE 6-6)

Chapter 11 XSCF Unit Replacement 11-3FIGURE 11-2 XSCFU Mounting Locations (Front of the M9000 Base Cabinet)XSCFU_B#0XSCFU_B#1

Strona 175

11-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 11-3 XSCFU Mounting Locations (Front of M9000 with the Expansion Cabinet)

Strona 176

Chapter 11 XSCF Unit Replacement 11-511.2 Active Replacement and HotReplacementNote – To replace the XSCF Unit, you must consider the version of the X

Strona 177 - 6.5 CPU and DIMM Replacement

11-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 11-4 Initial Page of the Maintenance MenuNote – DDC_A is displayed only f

Strona 178

Chapter 11 XSCF Unit Replacement 11-7FIGURE 11-5 Removing the XSCFU (Front of the M8000)121

Strona 179 - 6.5.1 Replacing a CPU Module

xxiv SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Product HandlingMaintenanceCaution – Certain tasks in this manual should only be

Strona 180 - 1. Remove the CPU Module

11-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 11-6 Removing the XSCFU (Front of the M9000 Base Cabinet)7. Place the rem

Strona 181 - CMU Guide Lock (Enlarged)

Chapter 11 XSCF Unit Replacement 11-9Note – When your system is the SPARC Enterprise M9000 server with ExpansionCabinet, pay attention to the XSCF mes

Strona 182 - Lever Up the CPU Module

11-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009For details of the unlockmaintenance command, see the SPARC EnterpriseM3000/M40

Strona 183 - Remove the CPU Module

Chapter 11 XSCF Unit Replacement 11-11For the version matching of firmware, see the SPARC EnterpriseM3000/M4000/M5000/M8000/M9000 Servers XSCF User’s

Strona 184

11-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – If the dual power feed option is installed, switch off the main lines

Strona 185

Chapter 11 XSCF Unit Replacement 11-1311. Switch on all main line switches for the AC section (ACS) in the power supplysystem.12. Confirm that the XSC

Strona 186

11-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200917. Restore the original mode switch setting on the operator panel.Note – When

Strona 187

12-1CHAPTER12Hard Disk Drive (HDD)ReplacementThis chapter explains the replacement procedures for the hard disk drive (HDD). Itcovers the following:

Strona 188

12-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 12-1 HDD Mounting LocationsTABLE 12-1 lists the abbreviated name and numb

Strona 189 - Mounting the CPU Module

Chapter 12 Hard Disk Drive (HDD) Replacement 12-31. Unlock and open a door of the server.For details, see Chapter 5.2. Prepare for the replacement of

Strona 190

Preface xxvEmission of Laser Beam (Invisible)Caution – The main unit and high-speed optical interconnect cabinet containmodules that generate invisibl

Strona 191

12-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 12-2 Removing the HDD6. Place the removed HDD on an antistatic conductive

Strona 192

Chapter 12 Hard Disk Drive (HDD) Replacement 12-57. Mount the replacement HDD by following the removal instructions in Step 5 inreverse order. Align t

Strona 193 - 6.5.3 DIMM Replacement

12-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 From a console that is connected to XSCF, log in to XSCF, and execute thepower

Strona 194 - Notch of DIMM

Chapter 12 Hard Disk Drive (HDD) Replacement 12-7Caution – Do not forcibly push the HDD when inserting it, even if it is not movingsmoothly. If the HD

Strona 195 - I/O Unit (IOU) Replacement

12-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 196 - 7.1 Overview of the IOU

13-1CHAPTER13PCI Slot Device ReplacementThis chapter explains the replacement procedures for devices that are mounted inthe PCI slots of an IOU. It co

Strona 197

13-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 Link cardIf PCI cards mounted in all the IOUs are not sufficient in number, th

Strona 198

Chapter 13 PCI Slot Device Replacement 13-3For the following devices, replacement procedures have the same steps except thatLEDs to be checked, eject

Strona 199

13-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. From the OS, execute the cfgadm -a command to verify the Ap_Id of the PCIcard

Strona 200

Chapter 13 PCI Slot Device Replacement 13-5Caution – When removing cables such as LAN cable, if your finger can't reach thelatch lock of the conn

Strona 201 - IOU#9, 11, 13, and 15 (rear)

xxvi SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Limitations and CautionsPower Control and Operator Panel Mode SwitchWhen you use

Strona 202

13-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009a. While grasping the lock bracket, turn it in the direction of the arrow andpus

Strona 203

Chapter 13 PCI Slot Device Replacement 13-7FIGURE 13-4 Loosening Screws of Latches

Strona 204

13-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 13-5 Removing the PCI Card

Strona 205

Chapter 13 PCI Slot Device Replacement 13-910. Mount the replacement PCI card on the PCI cassette. (Perform this work on theconductive mat.)FIGURE 13-

Strona 206

13-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Note – When the PCI cassette is removed from the IOU, the tab raises the front

Strona 207

Chapter 13 PCI Slot Device Replacement 13-11c. Align the PCI card with the center part of the lower latch of the cassette.Then, while pressing the PCI

Strona 208

13-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – If the card is short, move the screw at the bottom of the cassette as

Strona 209

Chapter 13 PCI Slot Device Replacement 13-13e. Using a Phillips screwdriver, tighten the green screw.Be sure to stop tightening the screw when the bot

Strona 210 - 7.3 Cold Replacement

13-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 If the lever of a PCI cassette cannot be inserted:a. When the lever of the PC

Strona 211 - FIGURE 7-7 - FIGURE 7-9)

Chapter 13 PCI Slot Device Replacement 13-15b. If the lever stops halfway even when the PCI cassette is inserted again, pullthe PCI cassette out from

Strona 212

Preface xxviiFujitsu Welcomes Your CommentsIf you have any comments or requests regarding this document, or if you find anyunclear statements in the d

Strona 213

13-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200913.3 Hot ReplacementThe procedure for hot replacement is as follows.1. Unlock a

Strona 214

Chapter 13 PCI Slot Device Replacement 13-17b. Loosen the two screws at the rear of the PCI cassette, slide out the latch, andsecure it with screws. (

Strona 215 - FAN Unit Replacement

13-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – Align the PCI card with the slot guides, insert it carefully, and sec

Strona 216 - 8.1 Overview of the FAN Unit

Chapter 13 PCI Slot Device Replacement 13-1913.4 Cold ReplacementIn cold replacement, none of the replacement work is performed with themaintenance me

Strona 217

13-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – After stopping all the domains, be sure to switch off the main linesw

Strona 218 - FAN_A#0-#3

Chapter 13 PCI Slot Device Replacement 13-21a. Move the PCI card in the direction of the arrow, and mount it on the PCIcassette by inserting the part

Strona 219

13-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 Press and hold down (for less than four seconds) the POWER switch on theopera

Strona 220

14-1CHAPTER14CD-RW/DVD-RW Drive UnitReplacementThis chapter explains the replacement procedures for a CD-RW/DVD-RW drive unit(DVDU). It covers the fol

Strona 221

14-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 14-1 CD-RW/DVD-RW Drive Unit Mounting Location (Front of the M8000)DVDU

Strona 222

Chapter 14 CD-RW/DVD-RW Drive Unit Replacement 14-3FIGURE 14-2 CD-RW/DVD-RW Drive Unit Mounting Location (Front of the M9000 BaseCabinet)DVDU

Strona 223

SPARC Enterprise™M8000/M9000 ServersService ManualManual Code C120-E330-08ENPart No. 819-7877-15August 2009, Revision A

Strona 224

xxviii SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 225

14-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 14-3 CD-RW/DVD-RW Drive Unit Mounting Location (Front of M9000 with the E

Strona 226

Chapter 14 CD-RW/DVD-RW Drive Unit Replacement 14-51. Unlock and open a door of the server.For details, see Chapter 5.2. Stop all connection to the ta

Strona 227 - 8.3 Cold Replacement

14-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098. From the OS, execute the cfgadm -a command to verify that the status ofCD-RW/

Strona 228 - FIGURE 8-11)

Chapter 14 CD-RW/DVD-RW Drive Unit Replacement 14-7FIGURE 14-4 Removing the CD-RW/DVD-RW Drive Unit (Front of the M8000)12

Strona 229

14-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 14-5 Removing the CD-RW/DVD-RW Drive Unit (Front of the M9000)13. Place t

Strona 230

Chapter 14 CD-RW/DVD-RW Drive Unit Replacement 14-918. From the OS, execute the cfgadm -c configure TAPE_Ap_Id command toconfigure the tape drive unit

Strona 231 - Power Supply Unit (PSU)

14-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20096. Connect the wrist strap clip to a cabinet grounding port, and attach the ban

Strona 232

Chapter 14 CD-RW/DVD-RW Drive Unit Replacement 14-1114.4 Cold ReplacementThe procedure is as follows.1. Unlock and open a door of the server.For detai

Strona 233 - Power cabinet

14-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20097. Remove the CD-RW/DVD-RW drive unit to be replaced. (See FIGURE 14-4 orFIGURE

Strona 234

15-1CHAPTER15Tape Drive Unit ReplacementThis chapter explains the replacement procedure for the tape drive unit (TAPEU). Itcovers the following: Sect

Strona 235

PA RTI Basic Information for Maintenance andTroubleshootingPart I provides maintenance information, explains methods of problem analysis,troubleshooti

Strona 236

15-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 15-1 Tape Drive Unit Mounting Locations (Front of the M8000)TAPEU

Strona 237 - M8000 PSU#0 to 8 PSU#10 to 19

Chapter 15 Tape Drive Unit Replacement 15-3FIGURE 15-2 Tape Drive Unit Mounting Locations (Front of the M9000 Base Cabinet)TAPEU

Strona 238

15-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 15-3 Tape Drive Unit Mounting Locations (Front of M9000 with the Expansio

Strona 239

Chapter 15 Tape Drive Unit Replacement 15-515.2 Active ReplacementThe procedure is as follows.1. Unlock and open a door of the server.For details, see

Strona 240

15-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098. From the OS, execute the cfgadm -a command to verify that the status of taped

Strona 241 - 9.3 Cold Replacement

Chapter 15 Tape Drive Unit Replacement 15-7FIGURE 15-4 Removing the Tape Drive Unit (Front of the M8000)12

Strona 242 - FIGURE 9-9)

15-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 15-5 Removing the Tape Drive Unit (Front of the M9000)13. Place the remov

Strona 243

Chapter 15 Tape Drive Unit Replacement 15-919. From the OS, execute the cfgadm -a command to verify that the status of tapedrive unit and the CD-RW/DV

Strona 244

15-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20097. Connect the wrist strap clip to a cabinet grounding port, and attach the ban

Strona 245 - Operator Panel Replacement

Chapter 15 Tape Drive Unit Replacement 15-111. Unlock and open a door of the server.For details, see Chapter 5.2. Change the mode switch setting on th

Strona 247

15-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20099. Mount the replacement tape drive unit by following the removal instructionsi

Strona 248 - 10.2 Cold Replacement

16-1CHAPTER16Clock Control Unit ReplacementThis chapter explains the replacement procedure for the clock control unit (CLKU).It covers the following:

Strona 249

16-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 16-1 CLKU Mounting Locations (Front of the M9000 Base Cabinet)CLKU_B#0CLK

Strona 250 - Removing the OPNL

Chapter 16 Clock Control Unit Replacement 16-3FIGURE 16-2 CLKU Mounting Locations (Front of M9000 with the Expansion Cabinet)TABLE 16-1 lists the abbr

Strona 251

16-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009The procedure is as follows.1. Unlock and open a door of the server.For details,

Strona 252

Chapter 16 Clock Control Unit Replacement 16-5a. If the M9000 expansion cabinet is installed, slide the cable support bracketat the front of the clock

Strona 253 - XSCF Unit Replacement

16-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20099. Mount the replacement CLKU by following the removal instructions in Step 7in

Strona 254 - XSCFU_B#0

Chapter 16 Clock Control Unit Replacement 16-713. Confirm that the replacement components are normal by using theshowhardconf or showstatus command of

Strona 255

16-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 256 - M8000 XSCFU_B#0, 1

17-1CHAPTER17Crossbar Unit ReplacementThis chapter explains the replacement procedure for crossbar units (XBUs). It coversthe following: Section 17.1

Strona 257

1-1CHAPTER1Safety and ToolsThis chapter provides notes on handling the high-end server descriptions and rulesabout operation, and it lists the tools r

Strona 258

17-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 17-1 XBU Mounting Locations (Front of the M9000 Base Cabinet)XBU_B#0-#7#7

Strona 259

Chapter 17 Crossbar Unit Replacement 17-3FIGURE 17-2 XBU Mounting Locations (Front of M9000 with the Expansion Cabinet)TABLE 17-1 lists the abbreviate

Strona 260

17-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092. Change the mode switch setting on the operator panel from Locked to Service.N

Strona 261

Chapter 17 Crossbar Unit Replacement 17-5b. Using a Phillips screwdriver, turn the knob screws securing the left andright eject/lock levers 90 to 180

Strona 262 - XSCF> unlockmaintenance

17-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20099. While grasping the eject/lock levers, properly align the crossbar unit with t

Strona 263 - 11.3 Cold Replacement

Chapter 17 Crossbar Unit Replacement 17-7Caution – If you are unable to obtain a torque screwdriver, finger tighten the clockcable connectors. Do not

Strona 264 - FIGURE 11-5 or FIGURE 11-6)

17-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Note – The showstatus command displays information on degraded components.18. Re

Strona 265

18-1CHAPTER18AC Section ReplacementThis chapter explains the replacement procedures for AC sections (ACSs). It coversthe following: Section 18.1, “Ov

Strona 266

18-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009An ACS distributes AC input power from external sources to power supply units(PS

Strona 267 - Hard Disk Drive (HDD)

Chapter 18 AC Section Replacement 18-3FIGURE 18-2 ACS Mounting Location (Front of the M9000 Base Cabinet)ACS_B

Strona 268 - 12.2 Active Replacement

1-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20091.1.2 Prompt NotationsThe following prompt notations are used in this manual.1.1.

Strona 269

18-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 18-3 ACS Mounting Locations (Front of M9000 with the Expansion Cabinet)TA

Strona 270 - Removing the HDD

Chapter 18 AC Section Replacement 18-518.2 Cold ReplacementIn cold replacement, none of the replacement work is performed with themaintenance menu fro

Strona 271 - 12.3 Cold Replacement

18-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – After stopping all the domains, be sure to switch off the main lineswi

Strona 272 - FIGURE 12-2)

Chapter 18 AC Section Replacement 18-7c. Remove the power cables.Caution – When removing power cables, switch off the main line switches. Thepower cor

Strona 273

18-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 18-5 Removing the AC Section (Front of the M9000)121

Strona 274

Chapter 18 AC Section Replacement 18-9FIGURE 18-6 Removing the Three-phase AC Section (Power Cabinet)8. Place the removed AC section on an antistatic

Strona 275 - PCI Slot Device Replacement

18-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200912. Start (turn on power) all domains together. Take either of the following tw

Strona 276 - ■ Link card

19-1CHAPTER19DDC ReplacementThis chapter explains the replacement procedures for DDCs (DC-to-DC Converters).It covers the following: Section 19.1, “O

Strona 277 - 13.2 Active Replacement

19-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 19-1 Mounting Locations of the DDCs (Front of the M8000)TABLE 19-1 lists

Strona 278

Chapter 19 DDC Replacement 19-319.2 Active Replacement and HotReplacementThe active replacement procedure and hot replacement procedure for the DDC ar

Strona 279 - Removing the PCI Cassette

Chapter 1 Safety and Tools 1-31.1.3 Environmental Requirements for Using ThisProductThis product is a computer that is intended to be used in a comput

Strona 280 - Lock bracket

19-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009c. From here, perform operations according to the guidance displayed in themaint

Strona 281 - Loosening Screws of Latches

Chapter 19 DDC Replacement 19-5FIGURE 19-3 Removing the DDC (Front of the M8000)5. Place the removed DDC on an antistatic conductive mat.121

Strona 282 - Removing the PCI Card

19-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20096. Mount the replacement DDC by following the removal instructions in Step 4and

Strona 283 - 2 Card positioning tab

Chapter 19 DDC Replacement 19-72. Change the mode switch setting on the operator panel from Locked to Service.Caution – When the maintenance work is c

Strona 284 - Mounting the PCI Card

19-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20098. Place the removed DDC on an antistatic conductive mat.9. Mount the replacemen

Strona 285

Chapter 19 DDC Replacement 19-914. Restore the original mode switch setting on the operator panel.Note – When the maintenance work is completed, be su

Strona 286 - FIGURE 13-9 reference)

19-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 287 - Tightening the Screw

20-1CHAPTER20Backplane ReplacementThis chapter explains the replacement procedure for backplanes (BPs). It covers thefollowing: Section 20.1, “Overvi

Strona 288 - Reinserting the Lever

20-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009In cold replacement, none of the replacement work is performed with themaintenan

Strona 289

Chapter 20 Backplane Replacement 20-3FIGURE 20-2 BP Mounting Locations (Front of the M9000 Base Cabinet)BP_B

Strona 290 - 13.3 Hot Replacement

1-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20091.2 PrecautionsThe following notes must be observed in maintenance work:1.2.1 Ope

Strona 291

20-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-3 BP Mounting Locations (Front of M9000 with the Expansion Cabinet)TAB

Strona 292 - FIGURE 13-11)

Chapter 20 Backplane Replacement 20-52. Change the mode switch setting on the operator panel from Locked to Service.Note – When the maintenance work i

Strona 293 - 13.4 Cold Replacement

20-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20096. Connect the wrist strap clip to a cabinet grounding port, and attach the band

Strona 294 - FIGURE 13-5)

Chapter 20 Backplane Replacement 20-7 M9000 (See FIGURE 20-7):Perform the following operations from the rear of the unit:a. Pull all mounted CMUs off

Strona 295 - FIGURE 13-9)

20-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-4 Preparation for Accessing BP_A (Rear of the M8000)

Strona 296

Chapter 20 Backplane Replacement 20-9FIGURE 20-5 Preparation for Accessing BP_B (Front of M9000)8. Remove the BP to be replaced. M8000 (See FIGURE 20

Strona 297 - CD-RW/DVD-RW Drive Unit

20-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009c. Arrange the cables so that the connectors do not get caught in anythingwhile

Strona 298

Chapter 20 Backplane Replacement 20-11FIGURE 20-6 Removing the BP (Rear of the M8000)

Strona 299 - Cabinet)

20-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-7 Removing the BP (Front of the M9000)9. Place the removed BP on an a

Strona 300 - 14.2 Active Replacement

Chapter 20 Backplane Replacement 20-1311. Switch on all main line switches for the AC section (ACS) in the power supplysystem.12. Confirm that the XSC

Strona 301 - # cfgadm -a

Chapter 1 Safety and Tools 1-51.2.3 Conversion and Reuse of This ProductIf this product is converted or a used article of this product is overhauled f

Strona 302

20-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200920.2.2 PSU BPFIGURE 20-8, FIGURE 20-9, and FIGURE 20-10 show the mounting locat

Strona 303

Chapter 20 Backplane Replacement 20-15FIGURE 20-9 PSUBP Mounting Locations (Front of the M9000 Base Cabinet)PSUBP_A#0PSUBP_A#1PSUBP_A#2

Strona 304

20-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-10 PSUBP Mounting Locations (Front of M9000 with the Expansion Cabine

Strona 305 - 14.3 Hot Replacement

Chapter 20 Backplane Replacement 20-172. Change the mode switch setting on the operator panel from Locked to Service.Note – When the maintenance work

Strona 306 - FIGURE 14-5)

20-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009c. Using a Phillips screwdriver, loosen the three thumb screws on the right sid

Strona 307 - 14.4 Cold Replacement

Chapter 20 Backplane Replacement 20-19FIGURE 20-11 Removing the PSUBP (Front of the M8000)PSUBP_BPSUBP_A

Strona 308

20-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-12 Removing the PSUBP (Front of the M9000)9. Place the removed BP on

Strona 309 - Tape Drive Unit Replacement

Chapter 20 Backplane Replacement 20-2113. Start (turn on power) all domains together. Take either of the following twoactions: Press and hold down (f

Strona 310

20-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-13 FANBP Mounting Locations (M8000)FANBP_C#1FANBP_C#0Front Rear

Strona 311

Chapter 20 Backplane Replacement 20-23FIGURE 20-14 FANBP Mounting Locations (Rear of the M9000 Base Cabinet)FANBP_BFANBP_A

Strona 312 - Tape drive unit TAPEU

1-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – Be sure to wear an antistatic wrist strap when handling components.Plac

Strona 313 - 15.2 Active Replacement

20-24 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-15 FANBP Mounting Locations (Rear of M9000 with the Expansion Cabinet

Strona 314

Chapter 20 Backplane Replacement 20-252. Change the mode switch setting on the operator panel from Locked to Service.Caution – When the maintenance wo

Strona 315

20-26 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009a. Remove all six FAN units. (See Chapter 8) After the FAN units are removed,re

Strona 316

Chapter 20 Backplane Replacement 20-27a. Using a Phillips screwdriver, loosen two thumb screws on each the left andright sides of the FANBP (FANBP_A o

Strona 317 - 15.3 Hot Replacement

20-28 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 20-17 Removing the FANBP (Front of M8000)

Strona 318 - 15.4 Cold Replacement

Chapter 20 Backplane Replacement 20-29FIGURE 20-18 Removing the FANBP (Rear of M9000)9. Place the removed BP on an antistatic conductive mat.10. Mount

Strona 319 - FIGURE 15-4 or FIGURE 15-5)

20-30 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200913. Start (turn on power) all domains together. Take either of the following tw

Strona 320

21-1CHAPTER21Sensor Unit ReplacementThis chapter explains the replacement procedure for the sensor unit (SNSU). Itcovers the following: Section 21.1,

Strona 321 - 16.1 Overview of the CLKU

21-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 21-1 Mounting Location of the SNSU (Front of the M8000)SNSUSNSU

Strona 322 - CLKU_B#1

Chapter 21 Sensor Unit Replacement 21-3FIGURE 21-2 SNSU Mounting Location (Front of the M9000 Base Cabinet)SNSU

Strona 323 - 16.2 Cold Replacement

2-1CHAPTER2Product Overview andTroubleshootingThis chapter provides information that is required in troubleshooting.This information is explained in t

Strona 324 - FIGURE 16-3)

21-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 21-3 SNSU Mounting Location (Front of M9000 with the Expansion Cabinet)TA

Strona 325

Chapter 21 Sensor Unit Replacement 21-5The procedure is as follows.1. Unlock and open a door of the server.For details, see Chapter 5.2. Change the mo

Strona 326

21-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009b. While grasping the thumb screws, pull out the SNSU carefully from the slot.FI

Strona 327

Chapter 21 Sensor Unit Replacement 21-7FIGURE 21-5 Removing the SNSU (Front of the M9000)8. Place the removed SNSU on an antistatic conductive mat.9.

Strona 328

21-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200912. Start (turn on power) all domains together. Take either of the following two

Strona 329 - Crossbar Unit Replacement

22-1CHAPTER22Media Backplane ReplacementThis chapter explains the replacement procedure for media backplanes (MEDBPs). Itcovers the following: Sectio

Strona 330

22-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 22-1 MEDBP Mounting Location (Rear of the M8000)MEDBP

Strona 331 - 17.2 Cold Replacement

Chapter 22 Media Backplane Replacement 22-3FIGURE 22-2 MEDBP Mounting Location (Front of the M9000 Base Cabinet)MEDBP

Strona 332 - FIGURE 17-3)

22-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 22-3 MEDBP Mounting Locations (Front of M9000 with the Expansion Cabinet)

Strona 333

Chapter 22 Media Backplane Replacement 22-522.2 Cold ReplacementIn cold replacement, none of the replacement work is performed with themaintenance men

Strona 334

PleaseRecycleCopyright 2007-2009 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japan. All rightsreserv

Strona 335

2-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009The front and rear views of FIGURE 2-1, FIGURE 2-2, FIGURE 2-4, FIGURE 2-5, FIGUR

Strona 336

22-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – After stopping all the domains, be sure to switch off the main lineswi

Strona 337 - AC Section Replacement

Chapter 22 Media Backplane Replacement 22-7FIGURE 22-4 Removing the MEDBP (Front of the M8000)

Strona 338

22-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 22-5 Removing the MEDBP (Front of the M9000)9. Place the removed MEDBP on

Strona 339

Chapter 22 Media Backplane Replacement 22-9 From a console that is connected to XSCF, execute the poweron -a commandof XSCF.The power to all the doma

Strona 340

22-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 341 - 18.2 Cold Replacement

23-1CHAPTER23Switch Backplane ReplacementThis chapter explains the replacement procedure for switch backplanes (SWBPs). Itcovers the following: Secti

Strona 342 - FIGURE 18-6)

23-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 23-1 SWBP Mounting Location (Rear of the M8000)SWBP

Strona 343

Chapter 23 Switch Backplane Replacement 23-3FIGURE 23-2 SWBP Mounting Location (Front of the M9000 Base Cabinet)SWBP

Strona 344

23-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 23-3 SWBP Mounting Locations (Front of M9000 with the Expansion Cabinet)T

Strona 345

Chapter 23 Switch Backplane Replacement 23-523.2 Cold ReplacementIn cold replacement, none of the replacement work is performed with themaintenance me

Strona 346

Chapter 2 Product Overview and Troubleshooting 2-32.1.1 SPARC Enterprise M8000 ServerFIGURE 2-1 Front View - M8000PSUDDCXSCFUTAPEUDVDUSNSUFAN_BCMUAir

Strona 347 - DDC Replacement

23-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Caution – After stopping all the domains, be sure to switch off the main lineswi

Strona 348 - M8000 DDC_A#0, 1

Chapter 23 Switch Backplane Replacement 23-7FIGURE 23-4 Removing the SWBP (Rear of the M8000)

Strona 349

23-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 23-5 Removing the SWBP (Front of the M9000)9. Place the removed SWBP on a

Strona 350

Chapter 23 Switch Backplane Replacement 23-913. Start (turn on power) all domains together. Take either of the following twoactions: Press and hold d

Strona 351

23-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 352 - 19.3 Cold Replacement

24-1CHAPTER24Addition and Deletion of a RDPFOption, Power Cabinet, and M9000Expansion CabinetThis chapter explains the procedures for adding and delet

Strona 353 - FIGURE 19-3)

24-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200924.1 Addition and Deletion ofRack-mountable Dual Power FeedThis section explains

Strona 354

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-3FIGURE 24-1 RDPF Mounting Location (M8000)TABLE 24-1

Strona 355

24-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009The procedure is as follows.1. Unlock and open a door of the server.For details,

Strona 356

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-5c. Remove the connector panel (together with a thumb

Strona 357 - Backplane Replacement

2-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-2 Rear View - M8000FAN_BACSAir FilterIOU

Strona 358 - 20.2.1 M8000/M9000 BPs

24-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009g. Mount the dual power feed unit (with four screws) on the two poles at thefron

Strona 359

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-7FIGURE 24-4 Mounting the Cable (Rear of M8000)m. Mou

Strona 360 - For details, see Chapter 5

24-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 24-5 Mounting the Connector Unit (Rear of M8000)o. Mount the two brackets

Strona 361

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-9FIGURE 24-6 Mounting the Frame for ACS Mount (Rear o

Strona 362 - FIGURE 20-4):

24-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 24-7 Removing the ACS (Rear of M8000)s. Mount nine power supply units (P

Strona 363 - FIGURE 20-5):

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-11FIGURE 24-8 Mounting the PSU (Front of the M8000)9.

Strona 364

24-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 From a console that is connected to XSCF, execute the poweron -a commandof XS

Strona 365

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-13 Adding or deleting a power cabinet for the SPARC

Strona 366

24-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 24-10 M9000 Base Cabinet + Power CabinetPower cabinet

Strona 367

Chapter 24 Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet 24-15FIGURE 24-11 M9000 Expansion Cabinet + Power Cabine

Strona 368

Chapter 2 Product Overview and Troubleshooting 2-5FIGURE 2-3 Internal View - M8000PSUBP_BPSUBP_AFANBP_CMEDBPSWBPFANBP_CBP_A

Strona 369

24-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 24-12 M9000 Base Cabinet + M9000 Expansion CabinetM9000 expansion cabine

Strona 370 - 20.2.2 PSU BP

25-1CHAPTER25Addition and Deletion of CMU,DIMM, IOU, HDD, PCI Cards andTAPEUThis chapter explains the procedures for installing new FRUs and removing

Strona 371 - PSUBP_A#2

25-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Some FRUs can be actively added or actively deleted: Active addition or removal

Strona 372

Chapter 25 Addition and Deletion of CMU, DIMM, IOU, HDD, PCI Cards and TAPEU 25-3FIGURE 25-1 Initial Page of the Maintenance MenuNote – DDC_A is displ

Strona 373 - FIGURE 20-11):

25-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094. Add the FRUs.Some steps for adding a FRU are the same as for replacing a FRU.

Strona 374 - FIGURE 20-12):

Chapter 25 Addition and Deletion of CMU, DIMM, IOU, HDD, PCI Cards and TAPEU 25-525.2.1 Active DeletionFirst, select a unit to be deleted as described

Strona 375

25-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20093. Switch off all main line switches for the AC section (ACS) in the power suppl

Strona 376

A-1APPENDIXASystem ConfigurationThis appendix describes the installation conditions and configuration of the SPARCEnterprise server.A.1 Installation C

Strona 377 - 20.2.3 FAN BP

A-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Be sure to use the same type of CPUM in each pair (CPUM#0 and CPUM#1, orCPUM#2 an

Strona 378 - Front Rear

Appendix A System Configuration A-3TABLE A-1 System Configuration for SPARC Enterprise M8000 ServerUnit Number CommentsCabinet1CMU1to4CPU module2or4•

Strona 379

2-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.1.2 SPARC Enterprise M9000 Server (Base Cabinet)FIGURE 2-4 Front View - M9000 (

Strona 380

A-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009A.2.2 SPARC Enterprise M9000 Server (Base Cabinet)The SPARC Enterprise M9000 serv

Strona 381

Appendix A System Configuration A-5TABLE A-2 System Configuration for SPARC Enterprise M9000 ServerUnit Number CommentsBase cabinet1CMU1to8CPU module2

Strona 382

A-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009A.2.3 SPARC Enterprise M9000 Server (Base Cabinet +Expansion Cabinet)This configu

Strona 383

Appendix A System Configuration A-7A maximum of 16 CMUs (64 CPU chips / 128 cores) and 16 IOUs can be mounted inthis model. A total of 128 core expans

Strona 384

A-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Slot#0, 2, 4, 6: PCI-EX short cards or IOU onboarddevice cardsSlot#1, 3, 5, 7: PC

Strona 385

Appendix A System Configuration A-9Single-phase and dual power feed optionPower cabinet(three-phase power feed option: includes 2 units ofAC section)*

Strona 386

A-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 387 - Sensor Unit Replacement

B-1APPENDIXBComponentsThis Appendix describes each component making up SPARC Enterprise.For the most up-to-date information, contact a certified servi

Strona 388

B-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009XSCF unit (M8000/M9000 Servers for basecabinet) B.11XSCFU_B Chapter 11XSCF Unit (

Strona 389

Appendix B Components B-3Note – *1 It uses the DR function. It is available in the configuration in which all theXSB on the target FRU can be detached

Strona 390 - 21.2 Cold Replacement

Chapter 2 Product Overview and Troubleshooting 2-7FIGURE 2-5 Rear View - M9000 (Base Cabinet)FAN_AAir FilterIOUCMU

Strona 391 - FIGURE 21-4 or FIGURE 21-5)

B-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.1 CPU Memory Board UnitThe CPU memory board unit (CMU) consists of a CPU memory

Strona 392

Appendix B Components B-5 For the bus connecting SC and SC as well as SC and crossbar unit, a high-speedlink is used. For the bus connecting SC and

Strona 393

B-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 A dedicated LSI for CPU is mounted. One CPU chip is mounted on a CPU module. I

Strona 394

Appendix B Components B-7B.3 MemoryThe type of memory used is DIMM.FIGURE B-3 shows the memory.FIGURE B-3 MemoryThe memory has the following character

Strona 395 - Media Backplane Replacement

B-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.4 I/O UnitAn I/O Unit (IOU) consists of an I/O board (IOB) with two types of co

Strona 396

Appendix B Components B-9 An IOU can be added or removed using the DR function during systemoperation. Active maintenance of PCI slots is possible u

Strona 397

B-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.5 Hard Disk DriveThe hard disk drive (HDD) is mounted on an IOU. Up to four HD

Strona 398 - M8000 MEDBP

Appendix B Components B-11FIGURE B-6 shows the PCICS.FIGURE B-6 PCI Express Short card cassette (PCICS)The PCI cassette has the following characterist

Strona 399 - 22.2 Cold Replacement

B-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.7 IOU Onboard Device CardThe IOU onboard device card (IOUA) is an option for m

Strona 400 - FIGURE 22-5):

Appendix B Components B-13B.8 Link Card (External I/O Expansion UnitConnection Card)The external I/O expansion unit connection card includes two link

Strona 401

2-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-6 Internal View - M9000 (Base Cabinet)PSUBP_AMEDBPSWBPFANBP_BBP_BFANBP_A

Strona 402

B-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.9 Crossbar UnitA crossbar unit (XBU: formal abbreviation is XBU_B) is mounted

Strona 403

Appendix B Components B-15 The XBU has a normal mode and a degraded mode. In normal mode, all eight setsoperate; and in degraded mode in which a fail

Strona 404

B-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.10 Clock Control UnitA clock control unit (CLKU: formal abbreviation is CLKU_B

Strona 405 - Switch Backplane Replacement

Appendix B Components B-17B.11 XSCF UnitXSCF unit (XSCFU: eXtended System Control Facility unit) controls the system.Two types of XSCFU are available:

Strona 406

B-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE B-12 eXtended System Control Facility Unit (XSCFU_C)XSCFU has the followi

Strona 407

Appendix B Components B-19B.12 CD-RW/DVD-RW Drive UnitThe CD-RW/DVD-RW drive unit (DVDU) can be mounted on each cabinet. One forthe M8000/M9000 with t

Strona 408 - M8000 SWBP

B-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.13 Tape Drive UnitTape drive unit (TAPEU) is optional and can be mounted on ea

Strona 409 - 23.2 Cold Replacement

Appendix B Components B-21 The tape drive unit has a label bearing the printed component number andmanufacture's serial number.B.14 Operator Pan

Strona 410 - FIGURE 23-4 or FIGURE 23-5)

B-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE B-16 Rear View of the Operator Panel (OPNL)OPNL has the following charact

Strona 411

Appendix B Components B-23B.15 Sensor UnitThe sensor unit (SNSU) monitors the intake-air temperature and humidity. In theM9000, this unit is mounted o

Strona 412

Chapter 2 Product Overview and Troubleshooting 2-92.1.3 SPARC Enterprise M9000 Server (ExpansionCabinet)FIGURE 2-7 Front View - M9000 (with the Expans

Strona 413

B-24 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.16 Power Supply UnitThe power supply unit (PSU) receives AC 200 to 240 V, and

Strona 414

Appendix B Components B-25B.17 AC SectionAC section (ACS) is positioned at the input side of the power supply unit (PSU), toprotect the system from el

Strona 415 - Expansion Cabinet

B-26 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 The ACS_B is a single-phase power feed unit for the SPARC Enterprise M9000serv

Strona 416 - 24.1 Addition and Deletion of

Appendix B Components B-27FIGURE B-22 AC Section (ACSTPH_A) The ACSTPH_B is a unit that receives three-phase (star) power for the SPARCEnterprise M80

Strona 417 - 24.1.2 Addition and Deletion

B-28 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE B-24 AC Section (ACSTPH_C) The ACSTPH_D is a unit that receives three-ph

Strona 418

Appendix B Components B-29 The ACS_D is an internal current power feed unit for the SPARC EnterpriseM8000 server/SPARC Enterprise M9000 server three-

Strona 419

B-30 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.18 FAN UnitThe FAN unit consists of two to three cabinet cooling FAN units. Tw

Strona 420

Appendix B Components B-31FIGURE B-28 FAN Unit (FAN_B)The FAN unit has the following characteristics. Active maintenance of a failed FAN unit during

Strona 421

B-32 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.19 Power CabinetA dual power feeder (DPF) and a three-phase AC power feeder ar

Strona 422

Appendix B Components B-33The power cabinet is shown in FIGURE B-29.FIGURE B-29 Power CabinetThe power cabinet has the following characteristics. Onl

Strona 423

2-10 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-8 Rear View - M9000 (with the Expansion Cabinet)FAN_AAir FilterIOUCMU

Strona 424

B-34 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.20 Rack-mountable Dual Power FeedRack-mountable Dual Power Feed (RDPF) is a de

Strona 425

Appendix B Components B-35B.21 BackplaneThe backplane (BP) is a printed circuit board (PCB) that has connectors and PCboard used to interconnect the c

Strona 426 - 24.1.2.2 Deletion

B-36 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE B-32 Backplane (BP_B)The BP has the following characteristics. Only cold

Strona 427 - M8000 + Power Cabinet

Appendix B Components B-37B.22 DDCDC-DC converter (DDC_A) supplies DC power to electronic components mountedon the backplane (BP_A) for M8000. DDC_A r

Strona 428

B-38 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.23 PSU BackplanePSU backplane (PSUBP) is a PCB that has a connector for interc

Strona 429

Appendix B Components B-39B.24 FAN BackplaneThe FAN backplane (FANBP) is a PCB that has a connector for connecting multipleFAN units (FAN_A or FAN_B).

Strona 430 - M9000 expansion cabinet

B-40 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE B-37 FAN Backplane (FANBP_B)FIGURE B-38 FAN Backplane (FANBP_C)FANBP has

Strona 431 - DIMM, IOU, HDD, PCI Cards and

Appendix B Components B-41 Because the FANBP is a built-in unit in the cabinet, only cold replacement isavailable for the FANBP. FANBP connects FAN

Strona 432 - 25.1 Addition

B-42 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009B.25 Media BackplaneThe Media backplane (MEDBP) is a PCB that has connectors for

Strona 433 - 25.1.2 Cold Addition

Appendix B Components B-43B.26 Switch BackplaneSwitch backplane (SWBP) is a PCB that has connectors to connect Media BP tomultiple IOUs. The SWBP is a

Strona 434 - 25.2 Deletion

Chapter 2 Product Overview and Troubleshooting 2-11FIGURE 2-9 Internal View - M9000 (with the Expansion Cabinet)2.2 Labels2.2.1 System Name Plate Labe

Strona 435 - 25.2.2 Cold Deletion

B-44 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 The SWBP has a label bearing the printed component number and manufacture&apos

Strona 436 - XSCF> showhardconf

C-1CHAPTERCExternal Interface SpecificationsThis appendix describes the specifications of the connectors provided on the SPARCEnterprise server unit:

Strona 437 - System Configuration

C-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009C.2 UPC PortC.3 USB PortTABLE C-2 UPC PortSetting Pin No> Signal name Input/ou

Strona 438 - A.2 System Configuration

Chapter C External Interface Specifications C-3C.4 Connection Diagram for Serial CableFIGURE C-1 Connection diagram for serial cable

Strona 439

C-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 440

D-1APPENDIXDUPS ControllerThis appendix explains the UPS controller (UPC) that controls the uninterruptiblepower supply (UPS) unit.D.1 OverviewThe UPS

Strona 441

D-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009D.3 Configuration of Signal LinesThis section provides the signal definitions.FIG

Strona 442 - Expansion Cabinet)

Appendix D UPS Controller D-3On: Indicates that the contact is closed.Off: Indicates that the contact is open.Note 1: Use a UPS that can normally supp

Strona 443

D-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009D.4 Power Supply ConditionsTABLE D-2 and TABLE D-3 show the power supply conditio

Strona 444

Appendix D UPS Controller D-5D.5 UPS CableThe UPS cable specifications are as follows: Connector shapeD-SUB9 pin male (receptacle side: female)DEU-9P

Strona 445 - AC section)

Copyright 2007-2009 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japon. Tousdroits réservés.Entrée et

Strona 446

2-12 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 The ID label or EZ label is affixed on the front door of the server, and it in

Strona 447 - Components

D-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009D.6 ConnectionsThis section explains the connection between the UPC port and UPS.

Strona 448

Appendix D UPS Controller D-7D.7 UPC PortThis chapter describes the location of the UPC port and the UPS connections. UPC#0 connects with UPS#0. UPC#

Strona 449 - Appendix B Components B-3

D-8 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009

Strona 450 - B.1 CPU Memory Board Unit

E-1APPENDIXEXSCF Unit Replacement When XCP1040 or 1041 Is in the ServerThe server must be updated to XCP 1050 or later.Note – XCP 1050 or later cannot

Strona 451 - B.2 CPU Module

E-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200912. Wait until XSCF firmware reaches the ready state.This can be confirmed when t

Strona 452

Appendix E XSCF Unit Replacement When XCP 1040 or 1041 Is in the Server E-319. Confirm switching over between XSCFs works properly.a. When the READY L

Strona 453 - B.3 Memory

E-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 200923. Turn the key switch on the operator panel from Service to Lock.

Strona 454 - B.4 I/O Unit

Abbreviations-1CHAPTERAbbreviationsAACS AC SectionACSTPH ACS Three-PhaseBBP BackplaneBUI Browser User InterfaceCCMB CPU Memory BoardCMU CPU/Memory Boa

Strona 455 - Appendix B Components B-9

Abbreviations-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009PPCICS PCI CassettePCI-ES PCI-Express ShortPFC Power Factor Correctio

Strona 456 - B.6 PCI Cassette

Index-1IndexAAC section, B-25AC section replacement, 18-1ACScold replacement, 18-5active replacement, 4-2, 4-3CD-RW/DVD-RW, 14-4CMU, 6-12DDC, 19-3DVDU

Strona 457 - FIGURE B-6 shows the PCICS

Chapter 2 Product Overview and Troubleshooting 2-13FIGURE 2-10 M8000 Label Location Front RearStandard labelSystem Name Plate Label

Strona 458 - B.7 IOU Onboard Device Card

Index-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009OPNL, 10-4PCI, 13-19PSU, 9-11PSU BP, 20-1servers BPs, 20-1SNSU, 21-4SWBP, 23

Strona 459 - Connection Card)

Index-3II/O box downlink card, B-13I/O unit, B-8I/O unit (IOU) replacement, 7-1ID label, 2-11incorporatingCMU/IOU, 4-6FRU into a domain, 4-6internal c

Strona 460 - B.9 Crossbar Unit

Index-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009hot replacement, 9-8PSU backplane, B-38PSU BPcold replacement, 20-1Rrack-mou

Strona 463 - B.11 XSCF Unit

2-14 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-11 M9000 Label Location FrontRearStandard labelSystem Name Plate

Strona 464

Chapter 2 Product Overview and Troubleshooting 2-152.2.2 Labels About HandlingThe labels shown below, which are affixed on the high-end server, provid

Strona 465 - B.12 CD-RW/DVD-RW Drive Unit

2-16 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 Removing an I/O unit (IOU)2.3 Operator PanelThe operator panel controls the hi

Strona 466 - B.13 Tape Drive Unit

Chapter 2 Product Overview and Troubleshooting 2-17FIGURE 2-12 Operator Panel Location (at the Front of M8000)2.3.2 Appearance and OperationsThe opera

Strona 467 - B.14 Operator Panel

2-18 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-13 Operator Panel2.3.3 LEDTABLE 2-1 lists the states of the server that

Strona 468

Chapter 2 Product Overview and Troubleshooting 2-19CHECK Amber Indicates the operating status of the SPARC Enterprise server.Off Normal state. Otherwi

Strona 469 - B.15 Sensor Unit

2-20 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.3.4 SwitchThe operator panel has the mode switch, which sets the operation mod

Strona 470 - B.16 Power Supply Unit

Chapter 2 Product Overview and Troubleshooting 2-212.4 Determining Which DiagnosticsMethods To UseWhen an error occurs, a message is often displayed o

Strona 472 - AC Section (ACS_C)

2-22 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 2-14 Diagnostic Method Flow ChartOS panic occurred or there’s anerror on

Strona 473 - AC Section (ACSTPH_B)

Chapter 2 Product Overview and Troubleshooting 2-232.5 Checking the Server and SystemConfigurationBefore and after maintenance work, the state and con

Strona 474 - AC power to 30 PSUs

2-24 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Also some conditions can be checked based on the lit and/ or blinking state of t

Strona 475 - AC Section (ACS_D)

Chapter 2 Product Overview and Troubleshooting 2-25 The software configuration and version can be checked in the Solaris OperatingSystem. Refer to th

Strona 476 - B.18 FAN Unit

2-26 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.5.2.2 Checking the Firmware ConfigurationLogin authority is required to check

Strona 477 - FAN Unit (FAN_B)

Chapter 2 Product Overview and Troubleshooting 2-27You can find more detailed descriptions of Solaris OS Predictive Self-Healing at thewebsite below:h

Strona 478 - B.19 Power Cabinet

2-28 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.6.2 Monitoring OutputTo understand error conditions, collect monitoring output

Strona 479 - Power Cabinet

Chapter 2 Product Overview and Troubleshooting 2-292.6.3 Messaging OutputTo understand error conditions, collect messaging output information, by usin

Strona 480 - FIGURE B-30

2-30 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Each error message logged by the predictive self-healing architecture has a code

Strona 481 - B.21 Backplane

Chapter 2 Product Overview and Troubleshooting 2-31that has caused the error indicate that an error has occurred. The LEDs on theoperator panel (back)

Strona 482 - Backplane (BP_B)

vContentsPreface xvii1. Safety and Tools 1–11.1 Symbols 1–11.1.1 Text Conventions 1–11.1.2 Prompt Notations 1–21.1.2.1 Command syntax 1–21.1.3 Environ

Strona 483 - B.22 DDC

2-32 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009CHECK(amber)Indicates either that the unit contains an error or that the unit is

Strona 484 - B.23 PSU Backplane

Chapter 2 Product Overview and Troubleshooting 2-33XSCFU and IOU(display part forLAN)ACT Lit (green) Indicates that communication is being performedth

Strona 485 - B.24 FAN Backplane

2-34 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.8 Using the Troubleshooting CommandsAfter the message in TABLE 2-8 is displaye

Strona 486 - FAN Backplane (FANBP_C)

Chapter 2 Product Overview and Troubleshooting 2-35 console message log panic message log IPL message log2.8.2 Using the fmdump CommandThe fmdump c

Strona 487 - Appendix B Components B-41

2-36 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.8.3.2 fmadm faulty CommandThe fmadm faulty command can be used mainly to ident

Strona 488 - B.25 Media Backplane

Chapter 2 Product Overview and Troubleshooting 2-37Note – The error information remains in the Solaris OS even when replacement ofthe faulty component

Strona 489 - B.26 Switch Backplane

2-38 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.9.1 iostat CommandThe iostat command iteratively reports terminal, drive, and

Strona 490

Chapter 2 Product Overview and Troubleshooting 2-39The following example shows output for one iostat command.2.9.2 prtdiag CommandThe prtdiag command

Strona 491 - C.1 Serial Port

2-40 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009The following example shows output for the prtdiag command in verbose mode.# prt

Strona 492 - C.3 USB Port

Chapter 2 Product Overview and Troubleshooting 2-41========================= IO Cards =========================LSB Name Model--- -------------- ------

Strona 493

vi SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.1.3 SPARC Enterprise M9000 Server (Expansion Cabinet) 2–92.2 Labels 2–112.2.1 Sy

Strona 494

2-42 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009==================================== CPUs ====================================CP

Strona 495 - UPS Controller

Chapter 2 Product Overview and Troubleshooting 2-4300 PCI 0 2, 50, 1000 3, 1, 0 okay --, 133 scsi-pci1000,50 LSI,1064/pci@0,600000/pci@0/scsi@100 PCI

Strona 496

2-44 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.9.3 prtconf CommandSimilar to the show-devs command run at the ok prompt, the

Strona 497 - Appendix D UPS Controller D-3

Chapter 2 Product Overview and Troubleshooting 2-452.9.3.1 OptionsTABLE 2-15 describes options for the prtconf command and how those options canhelp t

Strona 498 - D.4 Power Supply Conditions

2-46 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.9.4 netstat CommandThe netstat command displays the network status.2.9.4.1 Opt

Strona 499 - D.5 UPS Cable

Chapter 2 Product Overview and Troubleshooting 2-47The following example shows output for the netstat -p command.2.9.5 ping CommandThe ping command se

Strona 500 - D.6 Connections

2-48 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.9.5.1 OptionsTABLE 2-17 describes options for the ping command and how those o

Strona 501 - D.7 UPC Port

Chapter 2 Product Overview and Troubleshooting 2-492.9.6 ps CommandThe ps command lists the status of processes. Using options and rearranging thecomm

Strona 502

2-50 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20092.9.7 prstat CommandThe prstat utility iteratively examines all active processes

Strona 503 - 1040 or 1041 Is in the Server

3-1CHAPTER3Periodic MaintenanceCaution – The information in this chapter and subsequent chapters is intended forservice engineers.Persons other than t

Strona 504

Contents vii2.8.3.1 fmadm config Command 2–352.8.3.2 fmadm faulty Command 2–362.8.3.3 fmadm repair Command 2–362.8.4 Using the fmstat Command 2–372.9

Strona 505

3-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009Each tape drive unit used for operation must be cleaned once every 24 hours ofope

Strona 506

Chapter 3 Periodic Maintenance 3-3Note – One concern about cleaning the air filters while power to the server is on isthat dislodged dust may be sucke

Strona 507 - Abbreviations

3-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 3-1 Removing Air Filters (Example for the M8000)3. Pull out all of the air

Strona 508

Chapter 3 Periodic Maintenance 3-5FIGURE 3-2 Removing of Air Filters (Example Using the M9000 Base Cabinet)3.3 Cleaning an Air Filter (I/O Unit)Each I

Strona 509

3-6 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009FIGURE 3-3 Removing of Air Filters (I/O Unit)3. Use a vacuum cleaner to remove du

Strona 510

4-1CHAPTER4FRU Removal PreparationThis chapter explains the required basic operations for replacing components, in thefollowing sections: Section 4.1

Strona 511

4-2 SPARC Enterprise M8000/M9000 Servers Service Manual • August 2009 Section 4.6, “Emergency Switch-Off” on page 4-354.1 Types of Replacement Proced

Strona 512

Chapter 4 FRU Removal Preparation 4-34.2 Active ReplacementIn active replacement the Solaris OS must be configured to allow the component tobe replace

Strona 513

4-4 SPARC Enterprise M8000/M9000 Servers Service Manual • August 20094.2.1.2 Disconnecting a PCI cardCaution – Before you remove the PCI cassette, mak

Strona 514

Chapter 4 FRU Removal Preparation 4-54.2.2 Disconnecting and Replacing a FRU1. From the XSCF Shell prompt, use the replacefru command:Note – DDC_A is

Komentarze do niniejszej Instrukcji

Brak uwag